黄色大片影院视频免费,在线观看视频日韩,天天操天天操天天干,久久青青91费线频观青

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Ertan Hydropower Station (China)

Updated: 2014-04-01

The 550MW water-turbine generator units at the Ertan Hydropower Station had the largest single-unit capacity in China in the twentieth century. The consortium led by CGGC installed as many as four 550MW units for one single hydropower station in one installation workshop within one year, creating a national record in this field.

Electromechanical Equipment Installation at the Ertan Hydropower Station (China)

Electromechanical Equipment Installation at the Ertan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.